Product Details:
|
Capicity: | 1-10 Tons | Lifting Height: | 1-8m |
---|---|---|---|
Floor: | Ship Deck Steel | Warranty: | 12month |
Weighting System: | Choise | ||
High Light: | Fuji industrial freight elevator,4 Tons industrial freight elevator,3m vertical cargo lift |
Fuji 4 Tons Industrial Freight Elevator 3m Vertical Cargo Lift
Why Use This Cargo Lift ?
1. Non-Pit installation. The cargo lift elevator no need extra engine room or big pit, platform directly fixed on the ground, save space.
2. Lower fault rates. Hydraulic driving with simple control system. Much lower fault rates than other complex elevator system.
3. Much more lower cost. Simple control system and simple structure will lower the total service cost. Especially suitable for some low budget project. You can do maintenancework by yourself, no need any professional engineer.
Introduce
This cargo lift elevator droved by the electric and hydraulic system, lifting up and down along the guide rail.
Equipped single side or double sides hydraulic cylinder to keep the machinery works smooth and steady.
Installation & Control
• Installed in the pit or the ground floor.
• Control panels both on ground and top floor.
Standard Configuration
• Use high strength H Steel materials as guide rail structure.
• 1 or 2 pcs high strength hydraulic cylinder.
• Manual down valve on the machine..
• Anti-Rust and Anti-corrosion painting.
• Digital display control panels on every floor.
• Emergency stop: lifting and lowering process can be stopped immediately.
No. | Structure | Material name | Material | Specification |
1 | Body materials | Lead rail | manganese steel | 125*125H |
2 | Counter-tops truss | Q235C | 12# channel steel | |
3 | Up platform | Q345B | checkered plate 4mm | |
4 | Cylinder arm | Q235 | original tablet 9mm | |
5 | connecting pin | heat treatment 45# | Round steel 60*48mm | |
6 | Chain | |||
7 | Oil-lubricated bearings | |||
8 | Hydraulic system | Precision Hydraulic Cylinders | ||
9 | Sealing elements | |||
10 | High pressure piping | |||
11 | Supporting valve | |||
12 | Electric control | AC contractor | CJX1 | |
13 | Limit switches | YBLX-K3-20X/T | ||
14 | Micro Switch | |||
15 | Electric motor | 3KW | ||
16 | Voltage | customized | ||
The company has established a professional special team for installing elevators in old buildings, and can send professional maintenance personnel to the station according to the number of elevators installed in each community, so that they can reach the fault location within 15 minutes; and there will be preliminary coordination work. Professional project engineering supervision personnel timely and effectively deal with various problems arising during the construction process; so that every user who chooses Guangdong Fuji Elevator can get the greatest guarantee!
With a professional after-sales service team, it has led the establishment of the principle of "one call, two hours, and quick response to customer feedback" in the elevator industry, and integrated the active spirit into the full-service service. Only with a real sense of initiative can we serve customers Only by thinking more and doing more can we truly serve our customers well.
Contact Person: Mr. Feng
Tel: +13928523665